Instant Feature Rollback
A checkout fails. Bring the working one back.
Support reports a failing payment method in the new checkout. Your team needs time to investigate; customers need a working path. Keep a tested fallback ready to serve through a flag change.
A practical walkthrough with checkout-experience
The story · Recovery while the fix is still being written
A payment method fails. Customers need a working checkout now.
The new checkout has reached a pilot audience when support reports a failing payment method. The team still needs to reproduce the bug and review a fix. The existing implementation is already deployed and tested.
Illustrative scenario · Real product configuration
Inside FeatBit · 3 steps
Restore the working path in three steps.
Prepare OFF in advance, stop exposure when the candidate is implicated, and verify recovery in the application.
01Step 01 / 03
Make OFF mean a tested checkout.
Confirm that checkout-experience returns Existing checkout when OFF. Recovery depends on that implementation remaining deployed and usable.
- OFF variation
- Existing checkout
Turning the flag off has an explicit application behavior.
Inside FeatBitLive app · DemoSwipe to inspectTargeting → OFF variation Flag OFF
Existing checkout
A tested fallback is already deployed 02Step 02 / 03
Turn the affected release off.
After correlating the payment failure with New checkout, disable the flag. The demo shows the resulting OFF state; new evaluations return the fallback after the application receives the update.
- Flag status
- OFF
- New evaluations
- Existing checkout
Customers can use the stable path while the team investigates the candidate.
Inside FeatBitLive app · DemoSwipe to inspectTargeting → Flag status Payment failure
Flag OFF
Stop candidate exposure 03Step 03 / 03
Record the reason and verify recovery.
Keep the incident context in change history. Confirm that new checkout attempts use Existing checkout and payment errors recover before reopening a limited pilot.
- Check in telemetry
- Payment errors and completion
- Before restarting
- Fix and validate the candidate
The flag change starts recovery; the application signals confirm it.
Inside FeatBitLive app · DemoSwipe to inspectHistory → Flag status change Stable path restored
Verify recovery
Keep the candidate disabled during investigation
The next decision
Recovery comes before restarting the release.
A flag cannot undo completed payments or database changes. Verify the affected workflow and any side effects, then restart with a limited audience after the fix is reviewed.
Build your own release in FeatBitKeep the recovery boundary clear
A flag change affects behavior after the application receives and evaluates the update. It cannot undo completed payments, reverse database migrations, or cancel work already in flight; those need their own recovery plan.
From idea to implementation
Build your release path.
Keep the release moving.
All solutionsAutomatic Rollback
Connect external health alerts to an OFF trigger or restore a previous rollout through the REST API, FeatBit CLI, or MCP, such as returning from 20% to 10%.
Feature Impact Monitoring
Connect observability metrics with feature flag changes to assess release health throughout a rollout. Continuously monitor feature failures and infrastructure health to guide expansion or recovery.
Progressive Rollouts
Start an AI-assisted checkout with a small canary. Review errors and completion before more users receive the candidate.